Tri-C contracted with RJ Martin Electric to perform electrical work on a new natatorium and physical fitness center, as well as a remodeled dance studio.
The project duration was approximately 14 months.
Notable project details:
- Work was to be performed while school was in session.
- Electrical work was required by schedule when the natatorium’s pool was completed and filled with water. This required special safety consideration/training while conducting work around the pool.
- Electrical code required all metal in the vicinity of the pool to be continuously grounded.
Once completed, the project significantly enhanced a key Tri-C urban campus.